The CFBC Boiler Room Process (3) Coal Handling System
The CFBC Boiler Room Process (3) Coal Handling System includes ring hammer crusher, vibrating screen, suspended electromagnetic separators, bucket elevator, belt conveyor, vibrating feeder.
1. The CFBC Boiler Room Process (3) Coal Handling System Fuel adaptability.Combusstible not only with anthractie,lean coal,bituminous coal,in particular,can burn with coal gaugue,chain slag,blast furnance gas and low-grade fuel that other burning furnance can not burn.
2. The CFBC Boiler Room Process (3) Coal Handling System Combustion devices use of hood,porous form,so that the wind is uniform,the quality of flow is uniform and stable.By improving the shape of the head of the hood and the circumferential direction of arrangement of the holes optimal design,on the one hand to extend the life of hood,meanwhile it can improve the situation of the flow hood area,avoid cloth wind board dead,improve the flow quality of layer.Moreover,thera are two advantages by using this type of hood.One is to avoid the ash flowing back to wind box.And second,to avoid the use of bell shi hood o'clock slag particles into the dao hat head and the area between the inner tube can not clean up the problem.Thereby enhancing the overall performance of combustion equipment.
3. The CFBC Boiler Room Process (3) Coal Handling System Combustible fuel with higher sulfur content,by adding limestone to the furnance can significantly reduce the sulfur corrosion of the equipments,so that can meet the requirements of environmental protection.
The CFBC Boiler Room Process (3) Coal Handling System
The CFBC Boiler Room Process (3) Coal Handling System Combustion devices use of hood,porous form,so that the wind is uniform,the quality of flow is...
·Patent Certificate