Coal-firedBoilers Air Distribution Plate
Products relying on a strong technical backing, in order to "health world, future" as the enterprise idea, with energy conservation and environmental protection products and services in health, laboratory and other high-end technology, for human health and the health of the world, set up the green channel, we have to "abide by the laws, the good faith management, quality first" as the basic principle, in order to "serve the society, the harmonious environment" as the professional attitude, efforts to create "health product", to provide customers with quality service.
Our corporate culture: outstanding service quality, strict implementation of standards, the system composition, the consummation post-sale service.
Double Wings Gas Ducts structure. Ithas the features of small occupation, bigger output, quick pressure and high efficiency.
DZL6-1.25-AII (CNF USD) |
Name | Spec | Qty | Unit price | Total |
Boiler body | ------------- | 1 set | 44800 | 44800 |
FD fan | G6-41-11NO7.1AH=1910Pa Q=8100m3/h N=7.5KW | 1 set | 900 | 900 |
ID fan | Y6-41-11NO9C H=3994Pa Q=20829m3/h N=37KW | 1 set | 2200 | 2200 |
Reduction gearbox | GL-10P N=0.75Kw | 1 set | 1800 | 1800 |
Slag remover | GBC-6 L=5m | 1 set | 1350 | 1350 |
Economizer | S-6 | 1 set | 3350 | 3350 |
Electricalcontrol box | GDK-6T | 1 set | 2450 | 2450 |
Water feedingpump | QDG8-14×17 Q=8m3/hH=238m N=18.5Kw | 2 set | 1300 | 2600 |
Flue ducts | Q235-ACarbon Steel | 1 set | 1300 | 1300 |
Valves &Instrument | ------------ | 1 lot | 2400 | 2400 |
Coal feeder | TGS-6 | 1 set | 800 | 800 |
Watertreatment | BM-6 | 1 set | 1600 | 1600 |
DividedCylinder | FQ-500A DN150 | 1 set | 850 | 850 |
Dust collector | XTD-6 Q=19200m3/h | 1 set | 2100 | 2100 |
Steam Pump | QB-5 Q=15m3/h | 1 set | 800 | 800 |
Chimney | Q235Carbon Steel | 1 set | 2200 | 2200 |
Boiler Tot | 71500 |
Land FreightCharge | To Qingdao Seaport | 3000 |
Sea FreightCharge | FR and Container | 8500 |
Total Price | 83000 |
Optional Parts | The equipments under this subject are notnecessary devices for boiler. |
FrequencyControl | Control Scope: ID & FDfan Inverter Brand: ABB Germany | 4500 | 4500 |
Note: |
1.The price is CNF DHAKA USD. |
2. Payment terms: 30% dowmpayment, 70% by T/T or L/C at sight beforeshipment. but can be discussed. |
3.Production time: within 45 days after receiving downpayment. |
4.Sea freight charge alternative: |
$ 8,500.00 (Boiler Body by One 40' FR, Boiler Auxiliaries by One 40' and One 20' GP) |
5. The installation Fee: |
Theuser will afford the cost of the superviser in user country. For 6 ton boiler, we need to send 2 supervisers. |
The installation and testing period isabout 25-30 days. |
Thecustomer taker care of return tickets and supervieser charges and living costat sit. The salary for |
superviser is USD50.00 per day. |
Coal-firedBoilers Air Distribution Plate:
Output:Steam
Structure:Water/fire Tube
Fuel:Coal-fired
Usage:Industrial
Our corporate culture: outstanding service quality, strict implementation of standards, the system composition, the consummation post-sale service.