We operate a 3,000 metric ton (MT) per day (PD) sugar mill in the Caribbean and would like to increase our electricity generation capacity from the 3 Megawatts (MW) to 12 to 15 MW.
Of the estimated 15 MW of electricity generation potential from the processing of [the 3,000 MT] sugar cane, - we expect that 3 MW will be used for direct sugar mill plant operations, - with 12 MW to be available to the grid.
We would prefer multiple (minimum 2) boilers to service this project.
We would like to inquire as to your capacity and ability to consider this venture, - and if so, what would be the approximate cost and timeframe of implementing such a project.